Construction Progress for August 2026
Section 1:
- Pile foundation works – 100%
- Foundation base preparation
(concrete blinding, waterproofing) – 100% - Foundation slab construction – 100%
- Tower crane installation
- Construction of the monolithic
reinforced concrete frame – 22%
Section 2:
- Pile foundation works – 100%
- Foundation base preparation
(concrete blinding, waterproofing) – 100% - Foundation slab construction – 100%
- Tower crane installation
- Construction of the monolithic
reinforced concrete frame – 3%
Section 3:
- Excavation works – 100%