News

01.07.2026

The official start of sales for Kaskad Residence has launched!

The development company "Intergal-Bud" announces the official start of sales of a new large-scale residential complex of comfort class — Kaskad Residence, located on the left bank of the capital.

The project provides for the construction of two multi-section buildings with a height of 12 to 21 floors for 1859 apartments in the Darnytskyi district, on Prychalna Street, just 200 meters from the Dnipro.

The architectural feature is an expressive cascade concept with open terraces that form an additional private space for relaxation and work in the open air.

In each building, an own rooftop gas boiler house and backup generators are provided, which will ensure the autonomous operation of heating, elevators, and all engineering networks even during power outages.

A closed territory without cars, 24/7 security, equipped shelters — this is the basis of the complex's safety. Underground parking for 800+ car spaces, thoughtful landscaping, and over 30 thousand m² of infrastructure create a comfortable environment for life.

"During the pre-sale, which started on June 1, we saw a clear and high demand for the new project on the left bank of the capital," notes Oleksandr Poltorak, brand-marketer of the development company "Intergal-Bud." — "Buyers are attracted by the successful location of the complex, new approaches in construction, modern aesthetics of facades, autonomous engineering solutions. But the main factor is trust in the company. "Intergal-Bud" has been fulfilling its obligations for 23 years and enters into exploitation a large number of residential and commercial projects every year."

At the start of sales, special investment conditions are available for buyers: cost from 56,250 UAH/m², installment plans from the developer up to 2 years with a down payment from 40%.

In sale, a wide choice of layouts is presented:

  • 1-room apartments: 33.5 – 50.7 m²
  • 2-room apartments: 50.5 – 80.2 m²
  • 3-room apartments: 82.5 – 92.6 m²

The planned completion of construction of the first phase is scheduled for the IV quarter of 2028.

Other news

16.10.2026

News

Intergal-Bud Doubles the Benefits for Its Investors

15.10.2026

News

Invest in Square Metres with Greater Confidence: Intergal-Bud Assumes Construction-Related War Risks

08.10.2026

News

Safety at a Deeper Level at Kaskad Residence