Safety at a Deeper Level at Kaskad Residence

Feel safe at Kaskad Residence thanks to a shelter designed in accordance with modern building standards.
The comfortable shelter features additional structural reinforcement and radiation protection, while also meeting accessibility requirements: convenient and safe access is provided for every resident, including parents with strollers and elderly people.
The complex is autonomous: its own rooftop gas boiler house provides heating independently of the city’s district heating network, while backup generators support the operation of elevators, water supply, heating, and lighting in the lobby and corridors in the event of a power outage.
Apartments from 40 m² are available for sale: 1-bedroom apartments from UAH 2.4 million, 2-bedroom apartments from UAH 3.1 million, and 3-bedroom apartments from UAH 4.7 million. Each apartment comes with white-box finishing already included in the price.
Submit a request — we will help you choose an apartment in a safe and autonomous residential complex on the Dnipro Embankment.
*The price is approximate as of the publication date and is calculated in Ukrainian hryvnia based on the current USD/UAH exchange rate. The final apartment price is determined in the agreement.

.jpg&w=3840&q=80)
