News

05.10.2026

Autonomy Thought Through to the Smallest Detail at Kaskad Residence

At Kaskad Residence by Intergal-Bud, each building is heated by its own rooftop gas boiler house, independently of the city’s district heating network.

In the event of a power outage, backup generators keep the elevators, water supply, heating, and lighting in the lobbies and corridors running, allowing the complex to remain autonomous even without external power.

The buildings are equipped with shelters designed in accordance with current Ukrainian building regulations, with safety incorporated from the planning stage.

Each apartment is delivered with a white box finish already included in the price, allowing owners to move straight on to the final finishing stage.

Submit a request to receive available layouts and a price calculation for apartments in an autonomous residential building on Dniprovska Embankment.

*The price is approximate as of the publication date and is calculated in UAH based on the current USD/UAH exchange rate. The final apartment price is specified in the contract.

Other news

16.10.2026

News

Intergal-Bud Doubles the Benefits for Its Investors

15.10.2026

News

Invest in Square Metres with Greater Confidence: Intergal-Bud Assumes Construction-Related War Risks

08.10.2026

News

Safety at a Deeper Level at Kaskad Residence