News

04.10.2026

40% of the apartments in the first phase of Kaskad Residence have already been sold!

Buyers choose Intergal-Bud for its reliability, strong construction progress, and well-planned residential concept — and reserve their apartments while there is still a wide selection available.

A broad choice of apartments with balconies and terraces near the Dnipro Embankment is still available:

  • 1-bedroom apartments — from UAH 2.4 million
  • 2-bedroom apartments — from UAH 3.1 million
  • 3-bedroom apartments — from UAH 4.7 million

A special installment plan is currently available for up to 3 years, with a down payment from 30%.

Choose a modern and autonomous residential complex on Kyiv’s Left Bank, featuring a secure gated courtyard, a rooftop gas boiler house with backup generators, and equipped shelters compliant with current Ukrainian building regulations. Every apartment is delivered with White Box finishing already included in the price.

Submit a request, and we will help you choose an apartment with a balcony or terrace while a wide range of layouts is still available.

The price is approximate as of the publication date and is calculated in UAH based on the current USD/UAH exchange rate. The final apartment price is specified in the contract.

Other news

16.10.2026

News

Intergal-Bud Doubles the Benefits for Its Investors

15.10.2026

News

Invest in Square Metres with Greater Confidence: Intergal-Bud Assumes Construction-Related War Risks

08.10.2026

News

Safety at a Deeper Level at Kaskad Residence